Skip to content
TradeScribe
Start free

How it works

Rough notes in, finished estimate out

The whole thing takes about two minutes. Here is exactly what happens in between.

Your notes

bathroom rip out + refit

14 oak road, 3 bed semi

remove suite, take away

chase walls, new pipework

12sqm floor tiles @ £28

new combi? check flue

2.5 days me + mate

30% deposit

M. Hargreaves Plumbing

Estimate · EST-2608-4193

Word

Thank you for asking me to look at your bathroom. Below is my estimate for stripping out the existing suite and fitting the new one.

Remove existing suite
£340.00
Chase walls for pipework
£420.00
First and second fix
£700.00
Floor tiles · 12 m² × £28.00
£336.00
Total£2,155.20

Check this: your notes said “new combi?”, so it is priced provisionally, confirm after the flue check.

  1. 01

    Write your notes however you already write them

    There is no form to fill in and no fields to tab through. Type into one box, or photograph the pad. Fragments, abbreviations, trade shorthand and prices scribbled in the margin are all normal input.

    • Type it on a phone with one thumb
    • Photograph handwritten notes, several pages if you like
    • Paste a text message a customer sent you
  2. 02

    Tell us about your business once

    Your name, trade, day rate, VAT status, logo and the payment terms you always use. Saved to your account, so every estimate after the first one starts already knowing them.

    • Your logo goes on the document
    • Your day rate is used when notes say "two days"
    • VAT is added only if you say you are registered
  3. 03

    We write the estimate

    The work is itemised and priced from the rates in your notes. Sections are grouped the way a customer reads them. Assumptions and exclusions are written in, because those are what stop a disagreement three weeks later.

    • Grouped into sections, not one long list
    • A covering paragraph in your voice
    • Exclusions and assumptions suited to your trade
  4. 04

    Nothing is guessed, and nothing is padded

    If a figure in your notes could be read two ways, that line is marked for you to confirm. If there is no rate to price a line from at all, the price is left blank rather than invented, and the estimate shows no total until you have filled it in.

    • "Twenty two fifty" flagged as £22.50 or 2250mm
    • No rate to work from means a blank price, never a made up one
    • One notice about missing prices, not one per line
  5. 05

    Download a Word file and send it

    A real .docx, not a locked PDF. Change a price, reword a line, add something you forgot. Then email it, print it, or put it on your own letterhead.

    • Opens in Word, Google Docs, Pages and LibreOffice
    • Every part of it is editable
    • Your branding already applied

Things worth knowing

The maths is not done by AI

The AI decides what the line items are and what they should cost. Every multiplication and total is then calculated in ordinary code, in whole pence. A language model that is nearly always right about arithmetic is not good enough for a document you send a customer.

It will not invent your credentials

It never writes that you are Gas Safe registered, insured or accredited unless you have told it so. Claims like that on an estimate are yours to make, not ours to assume.

Your notes are not used to train anything

Your notes and photos are sent to Anthropic's Claude API to write the estimate and are not used to train AI models. Theprivacy policy sets out exactly what is stored and for how long.

You are still the one sending it

This writes a draft, and a good one, but it is going out under your name to your customer. Read it before you send it. That is why anything uncertain is flagged rather than hidden.

Try it on a job you quoted this week

3 free estimates a month. No card.

Write an estimate free